Wooden concrete foundation forms with metal braces on a residential construction site
ADU Builder · ‌

ADU Construction in Tarzana — Built Start to Finish

IBA Builders designs, permits and builds ADUs in Tarzana under one contract, with hillside access and drainage considered before the layout is finalized.

Licensed GC · CSLB #1074505 Serving ‌ One contract · permits to final inspection
Your local ADU contractor

A Licensed ADU Builder Serving Tarzana

Modern bathroom with cream vanity, round black mirror, mosaic backsplash, and gray tile flooring.

The flats north of Ventura Boulevard and hills to the south call for different ADU planning. A southern hillside site may need more grading, structural design and construction-access analysis, so we check those conditions before settling on a footprint. The Mulholland Scenic Parkway, Tarzana Streetscape and Ventura/Cahuenga Boulevard Corridor planning overlays also make the property’s location important: we check which overlay applies and account for any applicable review before finalizing the design.

We coordinate design, engineering, permits and construction under one contract. For properties following the Los Angeles Department of Building and Safety process, we prepare submissions and correction responses while coordinating related clearances. If the proposed work changes existing drainage patterns, we account for Bureau of Engineering roof-drainage clearance in the permit sequence. We hold California contractor license #1074505.

Where we build

ADU Construction Across Tarzana

From design and permits to construction and final inspection, IBA Builders serves homeowners throughout the city and the surrounding ‌ area — including these neighborhoods:

Step 01

Check Buildable Space and Utility Routes

Wood-framed window opening with installed window frame and exposed studs during construction.

We check zoning, applicable overlays, site access and utility routes before recommending a backyard ADU footprint. Service capacity and meter placement are part of that initial review, so utility coordination starts while the layout can still be adjusted.

Step 02

Design for Slopes and Existing Structures

White kitchen with stainless steel appliances, gas range, and subway tile backsplash

On southern hillside lots, we assess grading, structural needs and equipment access as part of design and engineering. For a garage conversion, we evaluate the existing foundation and framing, then identify upgrades needed for current codes and applicable Los Angeles Green Building Code requirements.

Step 03

Coordinate Plan Check and Required Clearances

IBA Builders team on site

The Los Angeles Department of Building and Safety handles residential permits and inspections here; we coordinate the ADU plans and responses to its code-review corrections. We also screen hillside parcels for fire-hazard designation and emergency access, because specified remote-roadway and Very High Fire Hazard Severity Zone ADUs require LAFD approval.

Step 04

Build Through Final Inspection

Completed ADU on a residential lot

We sequence site work, foundations, framing and specialty trades around the approved plans and LADBS inspections. For an accessory-building conversion, we include required structural, insulation, energy and life-safety upgrades in the construction scope and coordinate corrections through final inspection.

Planning an ADU in Tarzana?

Get an on-site assessment from a licensed general contractor — real feasibility, permitting and pricing for your lot, not a square-footage guess.

Why homeowners choose IBA

One Licensed Contractor, Start to Finish

No juggling designers, engineers and subs — we manage the entire ADU under one contract, to code, the first time.

✓

Licensed General Contractor

Licensed California contractor (CSLB #1074505) managing every stage of your ADU project.

✓

Permits to Final Inspection

Design, engineering, permits, construction and inspections handled under a single contract.

✓

Local ‌ Experience

We build to local code and know how local plan check and inspections actually run.

10+
Years building in LA
#1074505
CSLB License
1
Contract, start to finish
100%
Permitted & inspected
About IBA Builders

Building Across Los Angeles County

Founded by Itamar Assulin, IBA Builders is a licensed general contractor (CSLB #1074505) based in Sherman Oaks. We serve homeowners throughout Los Angeles County, building ADUs, custom homes, remodels and outdoor construction.

Our approach is simple: one licensed contractor manages design, engineering, permits, construction and inspections under a single contract — so your project stays accountable, on-code and on-track from the first drawing to final sign-off.

About IBA Builders
  • Itamar AssulinFounder
  • CSLB #1074505Licensed General Contractor
  • Sherman Oaks13743 Ventura Blvd #360
  • LA CountyAreas served
Built to last

Advanced Methods & Equipment

The unseen work that protects your investment for decades.

Engineered Foundations

Site-specific foundation and structural detailing designed to your lot and soil conditions.

Modern Waterproofing

Liquid-applied membranes and premium flashing for a vapor-tight, water-managed envelope.

Code-First Sequencing

Framing, mechanical and inspection phases sequenced so work passes the first time.

What affects the cost in Tarzana

A hillside foundation and a garage conversion present different budgeting questions in Tarzana. Grading, equipment access, drainage changes and utility routes can affect the work before interior finishes enter the estimate. An existing garage may need foundation, framing or insulation upgrades; a detached ADU needs its own site and structural plan. Kitchen cabinetry, bathroom tile and fixture selections also shape the scope.

We review those conditions alongside design, engineering, permits and applicable clearances before agreeing on scope and pricing in writing. Our detached ADU versus garage conversion guide can help frame that comparison. Call (310) 490-3414 to request a free on-site estimate.

Good to know

ADU FAQs for Tarzana Homeowners

Can my ADU use an express permit?

Only work listed as express-permit eligible can bypass plan review and proceed through PermitLA. We check the exact scope against that eligibility list before choosing the submission path. Plan for LADBS review when developing your ADU proposal; the department’s building permit guidance explains how the work scope determines the permit process.

What should I check before converting an older garage?

Start with the condition of the foundation, framing and building enclosure. New work used to convert or legalize an accessory building as an ADU must meet current codes and applicable Los Angeles Green Building Code requirements. We assess the structure and identify needed insulation, energy and life-safety upgrades so the conversion scope accounts for more than the interior layout.

How do utility easements and meters affect the layout?

LADWP requires construction to avoid its lines, rights-of-way and easements, so utility routes belong in the initial layout discussion. We review service capacity, meter location and address assignment while planning the ADU. Multiple-meter ADUs need separate legal addresses, and utility service requests have their own approval process to coordinate alongside the building permit.

What does IBA Builders handle under one contract?

We coordinate design, engineering, permit submissions, correction responses, construction and inspections under one contract. On a hillside property, that starts with access, drainage and applicable fire-review requirements; for a conversion, it includes evaluating the existing structure. Our ADU construction service brings these steps together, including specialty-trade coordination and owner involvement during permitting.

Ready to Build Your Tarzana ADU?

Book a free estimate and speak directly with a licensed ADU builder.