Accessory dwelling unit built by IBA Builders
ADU Builder · Irvine, Orange County

ADU Construction in Irvine — Built Start to Finish

We design, permit and build ADUs in Irvine under one contract, with permits through the City of Irvine and design that works with your village HOA.

Licensed GC · CSLB #1074505 Serving Irvine One contract · permits to final inspection
Attached ADU added to a single-family home
Your local ADU contractor

A Licensed ADU Builder Serving Irvine

Irvine is a master-planned city of villages, and that shapes every ADU. Most homes sit in an HOA with its own architectural guidelines, so a project needs both city and association approval. Older villages like Woodbridge, Northwood and Westpark have more established lots, while newer areas such as Great Park and Portola Springs have compact rear yards, and Turtle Rock and Quail Hill add hillside conditions.

We handle design, engineering, HOA submittal support, the permit with the City of Irvine's Building and Safety Division, Southern California Edison and IRWD coordination, construction and every inspection under one contract, with one point of contact from the first site visit to final sign-off.

Where we build

ADU Construction Across Irvine

From the established villages to the newest neighborhoods, we build throughout Irvine, including:

  • Woodbridge
  • Northwood
  • Turtle Rock
  • University Park
  • Westpark
  • Woodbury
  • Great Park
  • Quail Hill

We also build in nearby Santa Ana and Garden Grove. See every city on our areas we serve page.

Our process

How We Build Your Irvine ADU

Attached ADU project by IBA Builders
Step 01

Check Zoning, Setbacks and HOA Rules

We confirm your parcel's zoning, setbacks and lot coverage with the City of Irvine, and review your HOA's architectural guidelines. We also check sewer, water and power connections before laying out the ADU.

Space inside a home being planned as a junior ADU
Step 02

Design That Fits Your Village

The ADU is designed to match the main house and your HOA's palette, from roof pitch to colors and materials. On compact tract lots, layout focuses on setbacks, privacy and natural light, and on hillside lots we plan foundations and drainage from the start.

Step 03

Permits with the City and Your HOA

We submit the full permit set to the City of Irvine's Building and Safety Division, respond to plan-check corrections, and support your HOA architectural submittal so both approvals line up before construction. See our ADU permitting service for how we handle each step.

Step 04

Construction and Final Inspection

Construction moves through staged city inspections, from foundation and framing to rough-in and final. We plan deliveries, parking and work hours around HOA rules, and coordinate SCE and IRWD connections alongside the build.

Planning an ADU in Irvine?

Get an on-site assessment from a licensed general contractor — real feasibility, permitting and pricing for your lot, not a square-footage guess.

Why homeowners choose IBA

One Licensed Contractor, Start to Finish

No juggling designers, engineers and subs — we manage the entire ADU under one contract, to code, the first time.

✓

Licensed General Contractor

Licensed California contractor (CSLB #1074505) managing every stage of your ADU project.

✓

Permits to Final Inspection

Design, engineering, permits, construction and inspections handled under a single contract.

✓

City Permits and HOA Review

We plan every Irvine ADU for both the City of Irvine permit and your HOA's architectural review.

2015
Building in Los Angeles since
#1074505
CSLB License
1
Contract, start to finish
Irvine
City plan check to final inspection
About IBA Builders

Building Across Los Angeles County

Founded in 2015 by Itamar Ben Asulin, IBA Builders is a licensed general contractor (CSLB #1074505) based in Sherman Oaks. We serve homeowners throughout Los Angeles County, building ADUs, custom homes, remodels and outdoor construction.

Our approach is simple: one licensed contractor manages design, engineering, permits, construction and inspections under a single contract — so your project stays accountable, on-code and on-track from the first drawing to final sign-off.

About IBA Builders
  • Itamar Ben AsulinFounder
  • CSLB #1074505Licensed General Contractor
  • Sherman Oaks13743 Ventura Blvd #360
  • LA CountyAreas served
Built to last

Advanced Methods & Equipment

The unseen work that protects your investment for decades.

Engineered Foundations

Site-specific foundations for flat tract lots and sloped hillside parcels alike.

Modern Waterproofing

Liquid-applied membranes and premium flashing for a vapor-tight, water-managed envelope.

Code-First Sequencing

Framing, mechanical and inspection phases sequenced so work passes the first time.

Budget

What Affects the Cost in Irvine

In Irvine, cost depends heavily on the ADU type and the lot. A garage conversion or junior ADU reuses existing space, while a new detached unit needs its own foundation and shell. HOA design requirements can affect materials and finishes, and hillside lots in Turtle Rock or Quail Hill add foundation and drainage work.

After that, cost follows the size of the unit, the finish level, the distance to sewer and water connections, whether your electrical service needs an upgrade, and how easily crews and materials can reach the backyard. We price these line by line in a written estimate after a free site visit, so you can see exactly what drives the number for your property.

Good to know

ADU FAQs for Irvine Homeowners

Who issues ADU permits in Irvine?

Irvine is its own city, so ADU plans go to the City of Irvine's Building and Safety Division, part of its Community Development Department, not to LADBS or Orange County. Plan check and inspections all happen through the city.

We prepare the permit set, submit it, answer plan-check corrections and schedule every city inspection through final sign-off.

Does my HOA have to approve my ADU?

Most Irvine homes are in a village HOA, and most HOAs require architectural review for exterior work. State law limits how far an HOA can restrict an ADU, but the association can still review design details like colors, materials and rooflines.

We plan for HOA review alongside the city permit, so the design satisfies both.

Who provides water and power for an ADU in Irvine?

Electricity in Irvine comes from Southern California Edison, and water and sewer from the Irvine Ranch Water District (IRWD). Both may need to review new connections or service upgrades.

We check capacity early in design and coordinate those requests during permitting.

Can I build an ADU on a smaller lot in a newer village?

Often, yes. Newer villages such as Great Park, Portola Springs and Stonegate tend to have compact rear yards, so the layout has to work around setbacks, privacy and utility locations. Attached ADUs, garage conversions and junior ADUs are common options.

We check what your lot allows before design starts.

Are hillside lots harder in Irvine?

They take more planning. Areas like Turtle Rock and Quail Hill have sloped lots where foundation design, drainage and access need attention from the start. We assess the slope and soils before laying out the ADU.

What does IBA Builders handle on an Irvine ADU?

Everything under one contract: feasibility, design and engineering, HOA submittal support, the City of Irvine permit, SCE and IRWD coordination, construction and every inspection through final sign-off.

What affects the cost of an ADU in Irvine?

Mainly the ADU type and size, finishes, HOA design requirements, utility connections, any electrical service upgrade, slope on hillside lots and site access in tight tract layouts. We price these line by line after a free site visit.

Ready to Build Your Irvine ADU?

Book a free estimate and speak directly with a licensed ADU builder.